AEROSPACE PROPULSION / POWER GENERATION / PRECISION MACHINING
sales@starunitedengines.com +86 135 6071 3747 WhatsApp
Technical guide / engine and generator selection

Heavy-Fuel Engine & Generator Selection

Separate mechanical engine power from electrical generator output. Check continuous demand, peak load, fuel calibration and cooling before selecting a system.

1. Define the output and duty

State continuous and peak output, electrical-load profile, runtime, start-stop pattern and operating location.

2. Check the product references

HS60 is listed at 8.5 kW, HSD120 at 12 kW and HSD180K at 180–260 kW. These figures are reference data, not a suitability decision.

3. Define fuel, gas and site conditions

For piston references, state the intended fuel, altitude, cooling and starting requirements. For gas-power inquiries, provide composition, pressure, flow, contaminants, moisture, load profile and site connections before compatibility is discussed.

4. Request the right records

Identify the selected model or family, configuration, duty, inspection or test-information request, target market questions and project stage. Availability must be confirmed for the project.

Maximum vs Continuous Power

HS60 specifies 8.5 kW maximum mechanical engine power and HSD120 specifies 12 kW maximum generator output. Neither maximum value is a continuous rating. Define continuous load, peak demand, starting loads and duty cycle, then request the appropriate rating and electrical configuration.

Fuel Calibration & Consumption

HS60 and HSD120 list gasoline (petrol), kerosene and diesel. Their 240 g/kW·h consumption figure applies to diesel only. Confirm calibration and operating data for the intended fuel before calculating runtime, fuel demand or cooling requirements.

POWER-SYSTEM INPUTS

Discuss Engine or Generator Requirements

State the duty, site or flight conditions, package and document requirements.